23/04/2020
Work at Facility 00UGR (Sludge Dump) as part of the construction of the Rooppur NPP in Bangladesh
At the end of February, RoinWorld began work at Facility 00UGR (a sludge dump with a clarified water pumping station) as part of the construction of the Rooppur NPP in the People’s Republic of Bangladesh.
20/02/2020
Official video – Rooppur NPP, Bangladesh
In this video, we summarize our first results and talk about the achievements of RoinWorld in the construction of the Rooppur NPP from 2017 to 2019
26/11/2019
Vertical layout arrangement – site 9 of the Rooppur NPP
On November 20, RoinWorld completed work on Site No. 9 (vertical layout) as part of the Rooppur NPP construction. The total volume of washed sand was 173.570 m3.
27/10/2019
RoinWorld has washed more than 2,340.000 m3 of sand at 4 vertical planning sites as part of the construction of the Rooppur NPP.
As a reminder, work has now been completed on sites 18, 19, 11, and 10.
23/10/2019
Vertical layout arrangement – site 10 of the Rooppur NPP
At the end of September 2019, RoinWorld completed work on Site 10 (vertical layout) as part of the construction of the Rooppur NPP.
10/10/2019
RoinWorld construction works at the SMB-2 of the Rooppur NPP in Bangladesh
As a reminder, work has been underway since February 2018. For this moment, 26 sites out of 41 have been commissioned.
22/08/2019
Metal structures, 37 sites, Rooppur NPP
RoinWorld is performing installation of metal frame structures, wall and roof panels at 37 sites of the SMB-2 as part of the construction of the Rooppur NPP (Bangladesh).
22/08/2019
RoinWorld completed work on site 4.1, Rooppur NPP
One of the 41 sites to be commissioned by RoinWorld, the production building of the pre-assembly workshop with a total area of 4300 m2 is equipped with five overhead cranes and lifting mechanisms.
04/08/2019
Vertical layout arrangement – site 11 of the Rooppur NPP
On July 27, 2019, RoinWorld completed work on site 11 (vertical layout) in the framework of the Rooppur NPP construction
01/08/2019
Roinworld, together with AtomStroyExport, conducted firefighting training exercises at the Rooppur NPP.
Roinworld, together with AtomStroyExport, conducted firefighting training exercises at the Rooppur NPP.
22/03/2019
Vertical layout arrangement – site 19 of the Rooppur NPP
On March 18, 2019, RoinWorld completed work on site 19, the total volume of washed sand was 902,000 m3.
18/12/2018
Vertical layout arrangement – site 18
On November 30, 2018, RoinWorld completed work on site 18.
As a reminder, site 18 is part of the vertical planning project, work on which has been carried out by RW specialists since spring.
18/12/2018
Completion of work at the Training Center site
In early December, RoinWorld completed work on the Training Center site (underground part of the building), namely the installation of monolithic structures: foundations, walls, columns and floors below the 0.000 mark.
01/08/2018
Production of works on the site of the Training Centre
In the end of June, RoinWorld started works on the Training Centre facilities, particularly the installation of monolithic structures in the foundation pit, walls, columns, and floors below the level 0.000
28/05/2018
The device of vertical planning – 19 plot
On the 1st of April, Roin World began preparatory work for the vertical layout of site 19.