10 years on the market
Roin World S. L. was founded in 2007 by a team of qualified professionals in the construction of nuclear facilities, luxury housing, logistics and international transport services.
500 people, a team of professionals
The company brings together highly qualified technical and engineering employees and workers in different specialties, more than 500 people.
3 countries
Spain, Turkey, Bangladesh
COMPETITIVE ADVANTAGES
Principles of our company
— Operating in terms of transparency, partnership, integrity and responsibility.
Accomplishment of objectives
Over the years of successful work, we have accumulated extensive practical experience which allows us to offer optimal solutions to our Customers.
Long-term and productive cooperation
with our Customers – companies, leading in construction of nuclear power plants in the world.
Professional development and career building
our company is rapidly growing every day, and our team of professionals growing along with the company.
International Projects
the company takes part in the construction of nuclear power plants in different countries: Ruppur (People's Republic of Bangladesh), Akkuyu (Turkey).
Mission
Strengthening the company’s leadership position in the market of industrial construction, by implementing objectives, providing high quality at optimal cost and minimal execution period.
VALUES
EFFICIENCY
Our business activity is built on the principle of efficiency in everything we do.
QUALITY
The highest quality of work and service is fundamental for all the employees of our Company. It helps us achieve a leading position in the market.
RELIABILITY AND TRANSPARENCY
“Our relationship with employees, partners and customers is based on reliability and transparency. We always meet our obligations fully and punctually.”
NEWS
Work at Facility 00UGR (Sludge Dump) as part of the construction of the Rooppur NPP in Bangladesh
23/04/2020
At the end of February, RoinWorld began work at Facility 00UGR (a sludge dump with a clarified water pumping station) as part of the construction of the Rooppur NPP in the People’s Republic of Bangladesh.
Official video – Rooppur NPP, Bangladesh
20/02/2020
In this video, we summarize our first results and talk about the achievements of RoinWorld in the construction of the Rooppur NPP from 2017 to 2019
Vertical layout arrangement – site 9 of the Rooppur NPP
26/11/2019
On November 20, RoinWorld completed work on Site No. 9 (vertical layout) as part of the Rooppur NPP construction. The total volume of washed sand was 173.570 m3.
RoinWorld has washed more than 2,340.000 m3 of sand at 4 vertical planning sites as part of the construction of the Rooppur NPP.
27/10/2019
As a reminder, work has now been completed on sites 18, 19, 11, and 10.
Vertical layout arrangement – site 10 of the Rooppur NPP
23/10/2019
At the end of September 2019, RoinWorld completed work on Site 10 (vertical layout) as part of the construction of the Rooppur NPP.
RoinWorld construction works at the SMB-2 of the Rooppur NPP in Bangladesh
10/10/2019
As a reminder, work has been underway since February 2018. For this moment, 26 sites out of 41 have been commissioned.
Metal structures, 37 sites, Rooppur NPP
22/08/2019
RoinWorld is performing installation of metal frame structures, wall and roof panels at 37 sites of the SMB-2 as part of the construction of the Rooppur NPP (Bangladesh).
RoinWorld completed work on site 4.1, Rooppur NPP
22/08/2019
One of the 41 sites to be commissioned by RoinWorld, the production building of the pre-assembly workshop with a total area of 4300 m2 is equipped with five overhead cranes and lifting mechanisms.
Vertical layout arrangement – site 11 of the Rooppur NPP
04/08/2019
On July 27, 2019, RoinWorld completed work on site 11 (vertical layout) in the framework of the Rooppur NPP construction
Roinworld, together with AtomStroyExport, conducted firefighting training exercises at the Rooppur NPP.
01/08/2019
Roinworld, together with AtomStroyExport, conducted firefighting training exercises at the Rooppur NPP.
Vertical layout arrangement – site 19 of the Rooppur NPP
22/03/2019
On March 18, 2019, RoinWorld completed work on site 19, the total volume of washed sand was 902,000 m3.